Logistics · Truckload Building

Every Truckload Full. Every Window Met.

Big orders, one or two drops, and a trailer that should leave full. One AI-driven workflow combines orders heading the same way, fills each trailer by space or weight, and checks every delivery window and the driver's hours, so planners handle the exceptions instead of the combinations.

  1. 1Full by space or weight. Trailers fill to the pallet limit or the weight limit, whichever binds first.
  2. 2Every window and hour checked. Each drop is timed against its window and the driver's hours before anyone is dispatched.
  3. 3Exceptions flagged early. Orders that cannot go as entered are flagged, with a one-click way to resolve each.
One notional day of large orders, built into full truckloads

01The problem

From matching big orders by hand to loads built before the shift

Combining orders by hand

  • A planner pairs big orders from memory and a spreadsheet
  • Trailers leave at 65% because the right pair was missed
  • Heavy freight hits the weight limit before the pallet limit, unnoticed
  • Exceptions surface when a driver calls

Truckloads built automatically

  • Orders heading the same way are combined within your limits
  • Space and weight are checked together on every load
  • Windows and driver hours are checked on every drop
  • The planner sees only the few that need a decision

02The workflow

From the first order to a released load

Five steps, one record. The heaviest work happens in the middle, where large orders become full trailers.

  1. Orders in One clean list
    • EDI
    • Customer portals
    • Email
  2. Check Flags what cannot go as entered
  3. Load building Combine, fill and sequence
  4. Approve You decide the exceptions
  5. Release Drivers, your TMS and customer systems

03See it live

Watch a day of truckloads, then change the drops

The workflow plays on its own. Then change the maximum drops per trailer. In this notional day, sending every order alone needs 17 trucks at 62% full on average. Allowing two drops needs 12 trucks at 87%.

Notional orders, lanes, drivers and distances. The planner uses plain arithmetic (an insertion heuristic and exact stop ordering), not a language model, and it does not guarantee the best possible plan. A trailer holds 26 pallets or 44,000 lb, and a load that hits the weight limit first is marked 'by weight'. Driver hours shown are driving hours against an 11-hour limit. No load is dispatched and nothing is written to a TMS.

04Your rules

It plans inside the limits you already run

Rules are settings, not custom code, and a planner can change them and watch the plan re-solve.

  • Pallets and weight

    Each trailer fills to its pallet limit or its weight limit, whichever it reaches first.

  • One drop or two

    Set the maximum drops per trailer. One drop is a pure point-to-point truckload.

  • Delivery windows

    Each drop is timed against its window, with tight and late drops called out.

  • Driver hours

    Driving hours are checked against the limit, and long hauls are handed to relay planning.

  • Customer rules

    Deliver-before times and ride-alone requests are respected on every load.

  • On time or full

    One dial trades shipping on time against filling the trailer.

Frequently asked questions

What is truckload building?
It is turning a set of large customer orders into full trailer loads: deciding which orders share a trailer, how they fill it by space and weight, and in what order the drops are made, while respecting delivery windows and driver hours.
How is this different from multi-stop load building?
The orders are bigger, so a trailer usually carries one or two. The planning question is how to combine them so the trailer leaves as full as it can, by space or by weight. In multi-stop load building the orders are smaller, so the question is how many drops to allow and in what order.
How does it decide whether space or weight limits a load?
It checks both on every load. Heavy freight can reach the weight limit before the trailer is out of pallet positions, so the load is marked 'by weight' and no further orders are added.
Does it replace our transport management system?
No. It sits alongside your TMS, reads your orders and writes the approved plan back, using whatever your TMS supports, such as an API, EDI or screen automation. There is no rip and replace.
What happens to orders that cannot be loaded as entered?
They are flagged before the build, for example an order too large for one trailer, a window that cannot be met or a haul beyond the driver's hours. Each comes with a one-click way to resolve it, such as splitting it, asking the customer to move the window or handing it to relay planning.
Can planners override the plan?
Yes. A planner can drag an order to another trailer, change a rule, or take a truck out of service, and the plan re-solves immediately. Nothing is dispatched until it is approved.
What do we need to get started?
A sample of your orders, your trailer and delivery rules, and read access to your TMS. We usually begin with a prototype on a sample of your own orders so your planners can judge the plan against their own.

Ready to see your truckloads built before the day starts?

Book a free consultation and see how your own orders would load.

See It On Your Orders